Musi Rejuvenation Project – Phase one works starts in January 2027
HIGHLIGHTS
CM Revanth Reddy orders officials to complete works before deadline
Execute the PRTS works with proper planning
CM Revanth Reddy holds a High-Level meeting on Municipal and Urban Development today.
Hyderabad: Honourable Chief Minister Shri A Revanth Reddy ordered the officials to expedite the development projects which are being taken up by the state Municipal Administration and Urban Development department.
Reviewing the various projects of the MA and UD wing today , the Chief Minister sought updates on the progress of the Musi River Rejuvenation project and the development of radial roads.
The officials briefed the CM that, under Phase-1 of the Musi River Rejuvenation project, the 9.20 km stretch from Himayat Sagar to Gandhi Sarovar has been designated as ‘Zone-1A,’ and the 11.8 km stretch from Osman Sagar to Gandhi Sarovar as ‘Zone-1B.’ Preparations were already underway to commence Phase-1 works in January 2027 and the tendering process has already begun.
CM Revanth Reddy inquired about the progress of the development works at Mir Alam Tank. Officials said that the project would be completed by January 2028. The development of Mir Alam Lake, which includes removing the silt that has accumulated in the lake for a long time was discussed in the meeting.
Officials also updated the Chief Minister on the progress of radial road construction and land acquisition. The CM instructed the authorities to further accelerate the construction works of the redial roads.
CM Revanth Reddy reviewed the progress of the modern Goshala (cow shelter) which is currently under construction at Gandipet and the deadline to complete the works by March 2027.
During the meeting, officials informed the Chief Minister on the techno-economic feasibility of Phase-1 of the Personal Rapid Transit System (PRTS) in Hyderabad and the viability of an alignment stretching from Kukatpally through Raidurg to Biodiversity.
The MA and UD Officials presented proposals for an alignment running from the Begumpet Metro Station, passing through the Secretariat and Basheerbagh, and extending to Ranigunj. The Chief Minister suggested identifying suitable locations for PRTS depots, specifically around Necklace Road, Raidurg, and People’s Plaza and conducting a feasibility study for these sites.
The CM further instructed that preliminary plans be developed to incorporate multi-level parking facilities in the vicinity of the depots. Comprehensive plans should be finalized only after a thorough study of the routes, depot construction, and other related aspects.
City Commissioner presented several design options for a footbridge at the IIIT junction, located within the Cyberabad Municipal Commissionerate limits. The Chief Minister suggested the establishment of a multi-level car parking facility near the footbridge. CM Revanth Reddy inquired about the progress of the Integrated Fruit Market being constructed in Koheda. The Chief Minister emphasized the need to take up the works expeditiously without compromising the quality. The officials were also instructed that roads be constructed in parallel to ensure improved transport connectivity for the market.
The CM sought the details of the restoration of lakes and the protection of government assets under the purview of HYDRAA. The HYDRAA Commissioner explained proposals for setting up Sewage Treatment Plants (STPs) as part of the lake restoration. Speedy construction of the STPs and necessary measures for the restoration of stepwells across the city was also reviewed in the meeting.
State Chief Secretary Sanjay Jaju, Principal Secretary to the CM Seshadri, Secretary Manik Raj, HMDA Commissioner Sarfaraz Ahmed, HYDRAA Commissioner Ranganath, GHMC Commissioner Karnan, CMC Commissioner Srijana, MMC Commissioner Vinay Krishna Reddy, FCDA Commissioner Shashanka, HMWSSB MD Ashok Reddy, MRDCL MD Narsimha Reddy, HGCL MD Upender Reddy, Ranga Reddy District Collector Narayana Reddy, and other senior officials participated in the meeting.






